Q2 FY27 concall · earnings callGE Power India Limited

Q2 FY27 order intake rose 38% year-on-year to INR331 crores and revenue rose 11% to INR311 crores on core and upgrade execution, while the Shoaiba international award and NCLT approval for the Durgapur demerger advanced the shift to an asset-light services business.

Positive tone5-minute briefPublished 4 days after the call

Numbers
MetricThis quarterChangeFive-quarter trend
Order intake Q2₹331 Crup from ₹240 Cr in Q2 FY 25-26
Revenue from operations Q2₹311 Crup from ₹281 Cr in Q2 FY 25-26
Profit before tax and exceptional items from continuing operations Q2₹53 Crup from ₹46 Cr in corresponding quarter
Order backlog₹1,527 Crdown from ₹1,628 Cr as of 31 March 2026
Core Services orders Q2₹232 Crup from ₹162 Cr in Q2 FY26
Financials

From filed quarterly results. YoY and QoQ compare each metric on the same accounting basis.

QuarterRevenueNet profit (PAT)Basic EPS
Q3 FY25₹316.90 Cr-30.5% YoY+45.8% QoQ₹-18.58 CrTurned loss-making YoYTurned loss-making QoQ₹1.32+2100% YoY-11.4% QoQ
Q2 FY25₹217.42 Cr-38.6% YoY-49.4% QoQ₹66.87 CrTurned profitable YoYTurned profitable QoQ₹1.49Turned positive YoYTurned positive QoQ
Q1 FY25₹430.04 Cr+1.5% YoY+10.1% QoQ₹-9.54 CrLoss narrowed YoYTurned loss-making QoQ₹-1.42Loss/share narrowed YoYTurned negative QoQ
Q4 FY24₹390.76 Cr+13.4% YoY-14.3% QoQ₹25.94 CrTurned profitable YoY+6910.8% QoQ₹3.86Turned positive YoY+6333.3% QoQ
Q3 FY24₹456.22 Cr-14.4% YoY+28.8% QoQ₹0.37 CrTurned profitable YoYTurned profitable QoQ₹0.06Turned positive YoYTurned positive QoQ
TL;DR
  • Order intake grew 38% year-on-year to INR331 crores from INR240 crores, with Core Services orders up to INR232 crores from INR162 crores.
  • Revenue was INR311 crores versus INR281 crores, with Core sales up by ~ INR40 crores and upgrade sales up by ~ INR45 crores.
  • Profit before tax and exceptional items from continuing operations was INR53 crores versus INR46 crores; half-year revenue was INR620 crores versus INR567 crores.
  • Order backlog was INR1,527 crores versus INR1,628 crores at 31 March 2026, including about 20% FGD backlog.
  • Received two Notices of Award in August 2026 for Shoaiba Fuel Conversion Project in Saudi Arabia for approximately INR561 crores, with ~ INR76 crores booked in September 2026 and INR485 crores scheduled for December 2026 quarter.
  • NCLT Mumbai Bench sanctioned Durgapur demerger to JSW Energy with certified order received 13 October 2026, appointed date 1st July 2025, alongside a five-year manufacturing services agreement.
Said on the call

“We have successfully shifted our focus from volume-driven revenue chasing to prioritization of higher-margin, shorter cycle, and cash-accretive opportunities.”

Puneet Bhatla, Managing Director
From the Q&A
TopicWhat management said
Non-GE fleet servicingManagement said about 15%-17% of current order composition comes from the non-GE fleet, with about five units under refurbishment that become recurring service opportunities, but declined to give a three-year target.
Cash pool lendingOutstanding under group cash pool with LM Wind Power Blades India Private Limited was INR741 crores versus INR450 crores in March 2026, earning 5.65%-6.25%, repayable on demand and backed by GE Vernova Inc guarantee, with shareholder-approved limit raised to INR1,000 crores.
Flexible-operation retrofitsManagement said all RFQs issued so far for CEA-driven refurbishment for flexible operation have been won and more bids are under preparation, with current work on five units extending to 2028.
JV, subsidiary and taxThe INR5 crores difference between standalone and consolidated results was from the NGSL 50-50 JV with NTPC, not from GE Power Boilers Services which is not operating; current tax is only on interest on cash pool and FDs with carry-forward losses to be absorbed over about two years.
ReceivablesNet receivables of INR756 crores are down after collection of around INR350 crores from BHEL in FY 2025-26, with remaining balances described as good with nothing doubtful.
Shoaiba and FGD backlogShoaiba covers 9 of 14 boilers for oil-to-gas fuel conversion over 2.5 Years, with equipment supply and field advisory only and erection by Dar Al Balad; backlog of INR1,527 crores includes about 20% FGD, representing 14% to 15% of Q2 sales of INR311 crores.
Guidance
  • Balance INR485 crores of Shoaiba Fuel Conversion Project order scheduled for booking in the December 2026 quarter based on advance receipt.
  • Continued focus on core services and upgrades across GE and non-GE fleets with disciplined short-cycle project selection and no long-gestation EPC projects.
  • Record date for Durgapur demerger to be notified; shareholders to receive 10 fully paid equity shares of JSW Energy for every 139 fully paid equity shares held.
Source
Same sector

Others in Capital Goods & Engineering

All Capital Goods & Engineering →
  • AXISCADES Technologies LimitedQ2 FY27Positive tone

    AXISCADES posted record Q2 consolidated revenue of 359.1 crores while reporting a 47.3 crores PAT on a 129.3 crores divestment gain, with continuing operations still in loss after one-time non-cash impairments as it pivots to defence, XiDA, aerospace and space.

    Consolidated Revenue
    359.1 croresup 20% on a YoY
    Retained Business Revenue
    195.6 crores+30% YoY
    AXISCADESCapital Goods & EngineeringVerified brief3 guidance items
  • Triveni Turbine LimitedQ2 FY27Positive tone

    Q2 FY27 played out as expected with weak margins on a domestic-heavy mix, while record quarterly order booking of ₹7.64 billion lifted the closing order book to ₹24.53 billion to support a stronger H2.

    Revenue from Operations
    ₹491 Cr−3% lower YoY
    EBITDA Margin
    17.5%against 26.3%
    TRITURBINECapital Goods & EngineeringVerified brief4 guidance items
  • Ksb LimitedQ2 FY27Positive tone

    Non-nuclear order intake including Dangote, ONGC and supercritical thermal is supporting a ₹28,599 million order book while fixed-price contracts pressured margins and non-KSB test issues delayed nuclear pump revenue recognition to next year.

    Nine-month revenue
    ₹2,064.7 Cr
    Orders on hand YTD September
    ₹2,859.9 Cr
    KSBCapital Goods & EngineeringVerified brief7 guidance items
  • Behari Lal Engineering LimitedQ2 FY27Positive tone

    Q2 FY27 grew revenue about 22% and PAT about 28% year-on-year on volume and richer high-value mix, while sequential margin slipped on lagged pass-through of firmer scrap and power costs.

    Revenue from operations Q2
    ₹154.2 Crup 21.7% versus same quarter last year
    EBITDA including other income Q2
    ₹27.6 Crup 26.9% YoY
    BLELCapital Goods & EngineeringVerified brief4 guidance items
  • Vikram Solar LimitedQ2 FY27Positive tone

    Q2 FY27 volumes fell to 591 MW on deferred IPP and C&I offtake, but order intake doubled to 1.7 GW and EBITDA per watt rose 37% on richer distribution and DCR mix ahead of cell integration.

    Revenue from operations (Q2)
    ₹1,077 Crlower than Q1
    Sales volume (Q2)
    591 MWlower than Q1
    VIKRAMSOLRCapital Goods & EngineeringVerified brief4 guidance items